Treatment Plant

  • Owner: Metropolitan Council Environmental Services
  • General Contractor: Knutson Construction Services
  • Architect: CH2M Hill
  • Location: St. Paul, Minnesota
  • Contract Value: $1.2 Million

This project represents a heavy industrial slab installation. The 64,000 square foot solids management building is the largest fluid bed incinerator for wastewater treatments plants in the U.S. At the height of this concrete pour, THOR Construction was placing concrete at a rate of 450 cubic yards an hour for this 3,800 yard monolithic mat pour. The processes and procedures THOR Construction followed received high praise from the owner's representative. Subsequently, THOR Construction was awarded a sister project to this processing plant, further enabling us to show that we've got a "Secret Sauce".